Eagle Ford Permit and Well Map

Just released today: The latest Eagle Ford April  Permit and Well map shows a total of 5,484 Permits, which is an increase of 26 since last month.  Oil wells on line increased by 264 and Gas wells by 204 since March.

Eagel Ford Map April 2013

Source: Texas Railroad Commission

Injection Disposal Well FAQ

Injection Disposal Well FAQ: Texas is the nation’s number one oil and gas producer with more than 216,000 active oil and gas wells statewide. Injection and saltwater disposal wells are also located statewide to safely dispose of the produced water and frac fluid from these oil and gas wells. Texas has more than 50,000 permitted oil and gas injection and disposal wells.

Source: Texas Railroad Commission: http://www.rrc.state.tx.us/about/faqs/saltwaterwells.php

Interactive Map from the Texas Tribune: http://www.texastribune.org/series/water-for-fracking/map/ 

 

 

injection disposal well

Eagle Ford Housing Conference

Oilfield Housing Solutions Conference

San Antonio, TX | May 9-10, 2013

eagle-ford-housing-conference

 

 

 

 

 

 

Westin La Cantera – Hill Country Resort – 16641 La Cantera Place, San Antonio, TX 78356

This conference is in response to the challenges and opportunities arising from the sudden growth of the oil & gas “boom towns” throughout North America. These include finding and developing temporary and permanent housing solutions for the growing field force.

Read more at: http://www.petroleumhousing.com/

Recent Job Offerings in Eagle Ford

Eagle Ford News encourages job postings on our Facebook Page.  Here are some recent ones.

 

Mission Petroleum Carriers, Inc.  is now hiring Gas drivers in Victoria, Texas!

Phoenix Chemical Technologies – located in Cuero – is now hiring a Chemical Delivery Driver (experienced, HazMat required) and a Field Service Technician (entry level, no experience required).

 

Keep up with all the news at our Facebook page at www.facebook.com/EagleFord